Unit 417 Hydro Excavation
|
Check |
|
Pre Set Up |
Workers understand
Unit 417 SWP’s and discussed job hazards on Record of Tailgate (ROTG) form? |
|
Unit
417 Manufactures Operation Manual is on hand and accessible to
workers? |
|
|
Safe Work Zone is set up at worksite? |
|
|
Truck is parked to allow safe and easy operation of hose reels? |
|
|
Unit
417 Wheels are chocked? |
|
|
Check |
|
PPE |
CSA approved steel toe footwear worn? |
|
Protective eyewear always worn? |
|
|
High
visibility clothing worn? |
|
|
Gloves
always worn? |
|
|
Hard hat & ear protection worn? |
|
|
Check |
|
Procedure Checklist |
Worker can safely engage / disengage
PTO? |
|
Worker can safely remove & replace
manhole cover? (Always keep flat –
never put on edge) |
|
|
Worker can set up for from manhole or
pipe opening correctly? |
|
|
Worker is competent operating
hose reel, water pressure and throttle? |
|
|
Worker can advance and retract
rodder hose smoothly through pipe? |
|
|
Worker competent in retrieving,
stowing, and securing rodder hose for transport? |
|
|
Worker understands Valve
Schematic? |
|
|
Worker can complete a thorough
flush and clean pipe effectively? |
|
|
Check |
|
Emergency |
Worker knows location and is competent
in using emergency shutdown processes? |
|
Worker knows location of first aid equipment
on truck? |
|
|
Worker knows bloodborne pathogen SWP’s
and has been offered Hepatitis A/B vaccine? |
|
|
Worker knows to report incidents,
injuries and near misses to supervisor without delay? |
|
|
|
|